MPRIN in Italy: understanding curtailment and renewable energy remuneration

17 Nov 26

When Terna instructs a renewable energy plant in Italy to reduce or stop production, a key question is how the energy not produced will be remunerated. Reimbursement may appear straightforward.

In practice, the MPRIN mechanism is considerably more complex.

MPRIN (Mancata Produzione da fonti Rinnovabili Non programmabili), the Italian mechanism for the remuneration of lost production from non-programmable renewable plants of any size, is designed to compensate eligible production that could have taken place in the absence of the out-of-market curtailment orders issued by Terna. Market-driven curtailment, self-curtailment at zero or negative prices, plant faults and RIGEDI emergency disconnections of MV plants are not covered.

However, curtailment does not automatically translate into full reimbursement. Eligibility requirements, technical and measurement data, plant availability, correct response to curtailment instructions and specific calculation methodologies can all influence the amount ultimately recognised. Remuneration is not automatic either: each production unit needs an application on the GSE portal, and payments go to the Balance Responsible Party (BRP), usually coinciding with the energy trader, which passes it on, in full or in part, to the owner according to the agreements between the parties.

The framework has also continued to evolve. ARERA Resolution 128/2025/R/efr extended, from 1 April 2025, the remuneration mechanism to non-programmable renewable sources beyond wind, while GSE subsequently introduced new technical rules, procedures and operational tools for managing the process. The GSE MPRIN portal has been up and running since 31 March 2026. Plants that have changed BRP since April 2025 can still file applications with retroactive effect from 1 April 2025, but only until 30 November 2026: any pending case should be checked now.

From a Terna order to remuneration: what happens in between?

A curtailment order is only the beginning of the process.

Determining the remuneration requires assessing how much energy the plant could have produced without the curtailment event, while taking into account the applicable technical and operational conditions. GSE estimates this producible energy with a model fed by the plant’s primary-source sensors such as anemometers for wind or pyranometers for solar and declared unavailability. Terna then values the lost energy at the zonal day-ahead price and pays it monthly.

Plant response and performance, production and technical data, availability information and the applicable calculation methodology all play a role. The GSE process itself includes dedicated procedures for applications, contracts, technical data, calculation results, disputes and plant unavailability.

The key distinction is between the energy not produced during curtailment and the amount eligible for remuneration: the two do not necessarily coincide.

This complexity makes the correct management of MPRIN increasingly relevant for renewable asset owners operating in Italy.

How Vector Renewables can help

At Vector Renewables, we help asset owners manage the MPRIN process through a structured workflow. Our support combines technical, regulatory and operational expertise at each stage.

Our support covers three main areas:

  • Preliminary assessment
    We review the portfolio, curtailment orders received, contractual setup, available technical information and data to understand the plant’s position and identify the actions required. For smaller assets connected to the DSO grid in MV we can also check RIGEDI 2.0 compliance and, where upgrades are needed, provide advice, supplier selection and backoffice coordination of the works.
  • Qualification and setup
    We manage the MPRIN qualification process on the GSE portal, including the collection, validation and submission of the required documentation and technical information, through to model validation and the first published calculations.
  • Ongoing management and monitoring
    Every month we submit primary-source data and unavailability on time, or support the owner in doing so, check GSE calculations against an independent estimate, raise disputes where needed, monitor compliance with Terna orders and reconcile payments. We also handle the annual contract renewal.

Managing complexity, protecting value

For renewable asset owners, MPRIN is not simply about determining whether an asset has been curtailed. It is about understanding whether remuneration applies, how lost production is calculated and whether the amount recognised correctly reflects the specific event and plant conditions.

Having the right technical data, processes and expertise in place can therefore make a material difference.

Have your renewable assets in Italy been affected by Terna curtailment orders?

Vector Renewables can help you assess your portfolio and understand how MPRIN applies to your plants.

> Request a preliminary MPRIN assessment